Solar paired system provides demand charge management to reduce peaks for manufacturing facility
by Tracy Fosterling on Jun 30, 2021
Acumen EMS
case study
Demand Charge Management
top posts
PROJECT SUMMARY
The office supply manufacturer with a 400,000+ square foot manufacturing facility and warehouse wanted to pair energy storage with their roof-mounted solar PV system to shave peak demand, which results in high demand charges and electric bills. Energy Toolbase's Acumen EMS™ integrated with a Chint Power Systems (CPS) energy storage system was deployed to optimally shave peak and reduce the customer's demand charges.
Access this content
Fill out the fields below to access this content in full!