Tennessee Manufacturing Facility adds two Additional Acumen EMS systems to Shave Peak Demand
by Tracy Fosterling on Feb 16, 2022
Acumen EMS
energy storage controls
peak demand shaving
PROJECT SUMMARY
The developer had previously chosen Acumen EMS™ controls software on two sites to shave peak demand at a 400,000-square-foot office supply manufacturer in Dickson, Tennessee. After successfully commissioning and operating two previous systems utilizing Acumen EMS™ controls, the developer and end customer decided to purchase two more ESS solutions for their additional manufacturing facilities.
Access this content
Fill out the fields below to access this content in full!